PSV is based on a standard e orifice and is not sized for any specific process flowing conditions. Norriseal 1001A Trial Enamel InRelief valves piped outside Piping to skid edge cw individual connections Piping and instrument tubing securely supported Package is readied or dismantled only to the extent required for shipping Quality ControlTesting: Hydro tested to 1.5 times working pressure ABSA registered QC program 10 X-ray, No PWHT All instrumentation pneumatic tested and function tested Painting: SSPC-SP3 Surface preparation Painted with Cloverdale grey phenolic primer and Cloverdale industrial enamel in light grey Standard Drafting Terms: a) General arrangement drawings, with one revision after customer markups, are included in the quoted price.If further changes or revisions are required after the first revision has been issued, extra charges for engineering and drafting are applicable.Notes: 1. New, surplus 16 x 7-6, 600 ANSI, sweet service vertical separator package New surplus, never used, built in Drawing package with full description available Summary: Sweet Service 3 phase Gas leg 2 Dynaflo meter run, simplex Barton 3 pen recorder Liquid legs Dynaflo 2 NPT LC Dynaflo 1 NPT LCV Primary Flow 1 NPT turbine meters Fuel Gas Fuel Gas scrubber 8 x 30 Auto Drain HLSD PSVs on FGS, Taylor 1 x 1 on separator, Taylor 1 x 1 Two more, Umpro 14 NPT, 1440 Also included Inlet Control MasterFlo 2 inline choke valve LSH: Murphy 2 PSH: CVS Type 7970 COE Chemical injection pump Catadyne heater, 24,000 BTUhr TI PI x 3 PRV Belgas 1 NPT PRV Belgas 14 LG, RJV YStrainer 1 Tank, Westeel, 300 USGal.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |